Subgrade cut and proof-roll
Soft spots found and repaired.

Driveways, Roads & Hauling
Pavement lasts as long as the base under it. We cut, compact and grade the subgrade and stone base to the plan.
Call or text today615-431-3789Parking Lot Subgrade & Base
Asphalt and concrete do not fail from the top down. They fail when the subgrade is soft, wet or uneven. A parking lot needs a proper subgrade, a compacted stone base and a surface that drains toward the inlets before any paving crew arrives.
We prepare subgrade and base for parking lots, drives and loading areas across Nashville and Middle Tennessee. We cut to grade, proof-roll the subgrade, repair soft spots, place and compact base stone and trim to the plan so the paving crew can start on a firm, accurate surface.
What you get
Soft spots found and repaired.
Base placed in lifts and compacted.
Slopes set to drain to inlets.
Work timed with curb and storm crews.
The process
We review grades, drainage and the pavement section.
Subgrade is proof-rolled and base is placed.
The surface is trimmed for the paving crew.
FAQ
A loaded truck or roller drives the subgrade to show soft spots before the stone goes down.
We prepare the subgrade and base and coordinate with the paving contractor.
We trim to the planned slopes so water reaches the inlets and does not pond.
Related services
Service areas
From Clarksville to Shelbyville and Dickson to Cookeville, pick your city to see the excavation, grading and clearing work we handle in your part of Middle Tennessee.
Not on the list? Call 615-431-3789. We take projects across Middle Tennessee.
Call, text or send the form. Tell us about the property, what you need done and when, and we will take it from there.